713-338-0787
Houston Docks crew at work

Houston Docks

  • Thousands of satisfied customers
  • Local and family owned
  • +15 years in business
  • Licensed and insured
  • Always FREE Quotes
713-338-0787

Get a Quote (it's free!)

Engineered & Permitted Retaining Walls for Waterfront Properties in Houston, TX

Shoreline erosion, boat wake, and high-water events can undermine yards, docks, and foundations fast. We design and build retaining walls and bulkheads that stop erosion, protect your investment, and keep your waterfront usable year-round.

With 15+ years of marine construction in Greater Houston, we bring PE-stamped designs, OSHA-trained crews, and barge-mounted equipment to every project. We understand Lake Houston, Clear Lake, and bayou soils, permitting, and water level challenges.

Expect durable materials, proper drainage, and clean finishes that last. Need help now? Contact us for a free shoreline assessment and estimate.

Why Our Waterfront Retaining Walls Deliver Long-Term Protection and Value

You’re looking to stop erosion, protect structures, and improve access to the water—without constant repairs. Hiring professionals for Retaining Walls for Waterfront Properties Houston TX means safer construction, better materials, and a wall that works with local soils and water conditions. We manage design, permits, and installation, so you get reliable performance, less maintenance, and peace of mind.

Safety & Risk Elimination

Unstable banks can lead to collapsed yards, damaged docks, and liability exposure. We reduce risk with engineered designs, proper embedment, and tiebacks/deadman anchors sized to site soils and water loads. Our crews follow OSHA 29 CFR 1926, site-specific JHAs, and deploy turbidity curtains to protect water quality.

From Buffalo Bayou banks to canal-front lots, we mitigate scour with toe protection and riprap, and we stabilize slopes before failure spreads to patios, seawall caps, or pilings. Fully insured, we work from barges to avoid yard damage and keep neighbors safe throughout construction.

Professional Results & Quality

Professional installation prevents the common failures we see in DIY or underbuilt walls: bowing panels, washed-out backfill, and premature rot. We build to ASTM/ACI best practices, install geotextile filter fabric, and include drainage layers with weep holes to relieve hydrostatic pressure.

Materials are matched to conditions: CMI ShoreGuard vinyl PVC sheet piling or FRP/composite for longevity, galvanized steel where loads demand it, and reinforced concrete caps with aligned walers and corrosion protection. We load-test tiebacks, verify lines with laser levels, and document all critical steps.

Time & Stress Savings

Permitting along Houston waterways is complex. We handle USACE Galveston District Nationwide Permit 13 bank stabilization, City of Houston Floodplain Development permits, Harris County approvals, and Lake Houston Bulkhead Permit requirements. We coordinate HOA approvals and any Texas GLO coastal reviews when applicable.

You get one team from survey through final inspection. No guesswork, no chasing paperwork—just clear timelines and proactive updates until your shoreline is protected.

Cost-Effective Solution

Right-sizing design reduces lifetime costs. Value engineering might recommend vinyl over wood for lower maintenance, or riprap revetments where wave energy makes more sense than sheet piling. Avoiding improper backfill, shallow embedment, or missing drainage can prevent five-figure failures later.

Typical cost per linear foot depends on access, water depth, cofferdams, and materials. We provide transparent options so you understand the tradeoffs before we build.

Peace of Mind & Warranty

We stand behind our work with documented warranties on caps, tiebacks, and panels, plus scheduled maintenance plans. Our team provides as-built drawings, photos, and inspection reports for NFIP floodplain compliance files when needed.

Annual wall inspections catch small issues early—like cap cracking or minor scour—so you extend service life and avoid costly emergency work.

Get a Free Shoreline Assessment Today

Request your no-obligation quote and see options tailored to your bank, soils, and wave conditions. Fast scheduling across Greater Houston.

How Our Waterfront Retaining Wall Process Works

We make the process clear, safe, and predictable—from the first call to final walkthrough.

1) On-Site Assessment

We visit by land or barge, survey elevations with laser gear, review soils, wake exposure, and utilities, then discuss goals and access.

2) Design & Proposal

PE-reviewed drawings specify materials, embedment depth, tiebacks, and drainage. You get a detailed scope, timeline, and price.

3) Permits & Approvals

We handle USACE NWP 13, Floodplain Development, Lake Houston Bulkhead Permit, HOA, and any Harris County or GLO coastal filings.

4) Build & Install

Our barge, vibratory hammer, and dewatering pumps support safe sheet pile or riprap installation, with silt curtains for water quality.

5) Final Walkthrough & Maintenance Plan

We complete cap pours, cleanup, and punch list, then deliver as-builts and set a maintenance schedule.

It’s Easy to Get Started

Share your address and a few photos. We’ll schedule a site visit and provide a clear, written plan—no pressure, no surprises.

Why Choose Houston Docks for Retaining Walls in Houston

At Houston Docks, we design and build high-performing waterfront retaining walls shaped by local experience and engineering rigor. Our projects are PE-reviewed, our crews are OSHA-trained, and our equipment is marine-ready. From Lake Houston to Clear Lake and Galveston Bay, we know the soils, wake patterns, and permitting nuances that drive long-term performance.

Engineered Expertise

Every structural wall is designed or reviewed by a Texas Professional Engineer. We apply CMHA (formerly NCMA) segmental retaining wall principles where appropriate and use geotechnical inputs to size tiebacks, walers, and embedment depths. For complex sites, we add helical anchors/tiebacks and perform load testing with calibrated equipment.

Our team includes CPESC and CESSWI-trained professionals who focus on erosion and sediment control—critical for bayous and floodplains.

Safety, Licensing & Insurance

We operate under strict safety protocols: OSHA 10/30, daily JHAs, and marine practices aligned with EM 385-1-1. Our sites use silt fences and turbidity curtains to protect waterways, and lockout/tagout procedures for barge and crane operations.

We are fully insured and compliant with City of Houston permitting for walls over 4 feet, including Floodplain Development approvals where required.

Purpose-Built Marine Equipment & Materials

We deploy barges, work boats, vibratory hammers, hydraulic jetting equipment, and amphibious excavators for soft banks. Laser levels, dewatering pumps, and plate compactors ensure precise alignment and compaction.

Material options include vinyl PVC sheet piling (e.g., CMI ShoreGuard), FRP/composite sheet piling, galvanized steel, pressure-treated timber, and reinforced concrete caps—with corrosion protection like sacrificial anodes where needed.

Permitting Mastery & Local Knowledge

We navigate USACE Galveston District Nationwide Permit 13, Houston Permitting Center Floodplain Management, Harris County Engineering, and Lake Houston Bulkhead Permit submittals. For coastal work, we coordinate Texas GLO as applicable.

Local insights matter. We design differently for Kingwood/Atascocita lakefronts than for Seabrook/Kemah along Clear Lake due to boat wake, fetch, and salinity differences.

Customer-First Guarantees

We provide clear documentation, photos, and as-builts; phased invoices tied to milestones; and written workmanship warranties. Our maintenance plans include seasonal checks for weep hole functionality, cap condition, and shoreline scour so your investment stays protected.

Experience You Can Trust

Join homeowners across Lake Houston, Clear Lake, and the bayous who rely on us. Request your engineered shoreline plan today.

Built-To-Last Waterfront Retaining Walls, Proven Across Greater Houston

We design and build retaining walls and bulkheads that perform in Houston’s unique conditions—expansive clays, fluctuating water levels, and heavy boat traffic. Our Retaining Walls for Waterfront Properties Houston TX projects range from residential lakefront bulkheads to commercial canal walls and bayou bank stabilization across the Greater Houston area.

Types of Projects We Handle

Residential lakefront bulkheads, canal-front walls with integrated boat slips, and commercial marina seawalls. We also complete Buffalo Bayou bank stabilization, outfall armoring, and cap/tieback retrofits.

Recent examples include a 180 LF timber-to-vinyl replacement in Seabrook, a 260 LF riprap revetment on Buffalo Bayou, and a 120 LF canal bulkhead rebuild in League City.

Our Proven Methods & Materials

We install sheet piles with proper embedment and sealed interlocks, add toe protection and scour aprons, and build drainage layers with perforated pipe and weep holes. Filter fabrics prevent fines loss, and geogrid reinforcement supports segmental walls where applicable.

Common specs: weep holes every 6–8 ft, 4–6 in perforated drains to daylight, vinyl or FRP panels with designed batter, and reinforced concrete caps aligned to walers.

Complex Situations We’ve Mastered

We rebuild storm-damaged seawalls, stabilize failing caps, and correct leaning walls with tieback upgrades. In soft bayou banks, amphibious excavators and cofferdams allow precise work without excessive disturbance.

Where energy dissipation beats “hard wall,” we design riprap revetments or hybrid living shorelines using coir logs and native marsh plants.

Results You Can Expect

Stable banks, preserved yard space, and dependable access to docks and boat lifts. Typical construction durations run 1–3 weeks after permits, depending on length and access. Vinyl/FRP systems often deliver decades of service with minimal maintenance.

You’ll receive final QA/QC documentation, maintenance tips, and a schedule for periodic inspections.

Want to See Similar Local Projects?

Ask us for recent examples near your shoreline. We’ll share specs, timelines, and references from homeowners close to you.

Frequently Asked Questions

What is the best retaining wall for waterfront property?

The best system depends on soils, wake energy, and access. For many Houston sites, vinyl PVC or composite sheet pile bulkheads with proper tiebacks and drainage offer long service life and low maintenance. On bayous or gentle shorelines, engineered riprap revetments or hybrid “living shorelines” can dissipate energy better than a rigid wall. We evaluate fetch, boat traffic, and geotechnical data to recommend the right solution for your property and budget.

How much does a bulkhead cost per foot in Houston?

Costs vary by material, access (barge vs. land), water depth, cofferdam needs, and permits. As a planning range, bulkheads often run in the low-to-high hundreds per linear foot. Vinyl or composite sheet piling usually costs more up front than wood but lasts longer and needs less maintenance. We provide itemized proposals so you can compare life-cycle costs, not just initial price.

Do I need a permit for a bulkhead on Lake Houston?

Yes. Most projects require a Lake Houston Bulkhead Permit, City of Houston Floodplain Development review (where applicable), and often USACE Galveston District Nationwide Permit 13 for bank stabilization. Some properties may also need Harris County approvals or HOA sign-offs. We handle the submittals, drawings, and any required notifications to keep your project compliant and on schedule.

Do waterfront retaining walls need drainage and weep holes?

Absolutely. Drainage relieves hydrostatic pressure that can push walls outward. We install perforated drain pipe with gravel backfill, geotextile filter fabric, and weep holes typically spaced every 6–8 feet. This setup prevents fines from washing out while letting water escape. Proper drainage is one of the biggest differences between a long-lasting wall and one that fails prematurely.

Vinyl, wood, or concrete: which material should I choose?

Pressure-treated wood costs less initially but typically lasts the shortest time near water. Vinyl PVC or FRP/composite sheet piles resist rot and corrosion and often deliver the best life-cycle value. Concrete or steel walls are strong for high loads but may need more substantial foundations and corrosion protection. We’ll match materials to your shoreline energy, soil conditions, and maintenance goals.

What’s the typical timeline for design, permitting, and construction?

Design and proposal: about 2–4 weeks depending on surveys and engineering. Permitting: often 30–60 days for USACE/City reviews, longer if variances are needed. Construction: roughly 1–3 weeks for typical residential lengths once permits are in hand. We provide a schedule up front and coordinate around water levels and neighborhood access rules.

Can I convert my wooden bulkhead to vinyl or composite without changing the footprint?

Often yes, provided the replacement stays within the existing footprint and height, and meets local and USACE conditions. Many Lake Houston projects qualify under Nationwide Permit 13 with proper documentation. We may upgrade tiebacks, walers, and caps to current standards. Our permit package addresses footprint limits and any HOA or floodplain management requirements.

Is riprap better than a seawall for shoreline protection?

It depends on site energy and goals. Riprap excels at dissipating wave energy on bayous and low-to-moderate wake areas and can be combined with native plantings. Seawalls/bulkheads maximize yard space and vertical access where wave action or boat wakes are higher. In some cases we design hybrid systems that use both to balance protection, cost, and aesthetics.

Do I need an engineer to design my waterfront retaining wall?

Walls over 4 feet and most waterfront structures should be engineered. A Texas PE designs or reviews structural elements, tiebacks, and drainage to match site conditions and loads. Engineering is also commonly required by permitting authorities and insurers. We include PE-stamped drawings when needed to streamline approvals and ensure long-term performance.

What permits are required by the USACE Galveston District?

Most shoreline protection projects use Nationwide Permit 13 for bank stabilization. Some sites require Pre-Construction Notification based on impacts or location. We evaluate thresholds, prepare plans, and handle correspondence with the Galveston District. Our goal is to minimize review time by submitting complete, clear packages aligned with federal and local requirements.

Still Weighing Your Options?

We’ll compare vinyl, composite, riprap, or hybrid solutions for your shoreline and budget. Reach out for a clear, side-by-side plan.