713-338-0787
Houston Docks crew at work

Houston Docks

  • Thousands of satisfied customers
  • Local and family owned
  • +15 years in business
  • Licensed and insured
  • Always FREE Quotes
713-338-0787

Get a Quote (it's free!)

Licensed & Insured Piling Repair & Replacement in Houston, TX

Leaning piers, rotted piles, loose connections, or storm-damaged boat‑lift pilings threaten safety and property value. We fix the root cause with professional piling repair and replacement so your dock, pier, or boathouse is secure and level again. From marine borer damage in Galveston Bay to flood impacts on Lake Houston, we know what local waters do to structures.

For 15+ years, Houston Docks has completed thousands of projects using barge cranes, pile extractors, divers, and engineered methods like SnapJacket vinyl jackets, FRP wraps, and grout‑filled jacketing. We handle permitting with USACE and Texas GLO when needed. Expect lasting results, clean work areas, and straight, load‑bearing pilings. Need fast help? Contact us for a free inspection and estimate for Piling Repair & Replacement Houston TX.

Why Our Professional Piling Repair & Replacement Delivers Safer, Longer‑Lasting Results

You want a stable pier without surprises, delays, or recurring repairs. Hiring pros for piling repair and replacement means safer methods, correct materials, and work that holds up to tides, wakes, and storms. Our experienced team evaluates each piling, recommends the smartest fix, and executes with precision so you get a stronger structure and fewer future expenses.

Safety & Risk Elimination

Failing pilings can collapse decks, skew boat lifts, and injure people. We start by stabilizing the structure with temporary shoring and sister pilings where needed, then follow OSHA 29 CFR 1926.106 for working over water and USCG PFD rules on our work barge. This reduces liability and protects your family, guests, and equipment.

Example: After Hurricane Beryl, we secured a tilted lift in Seabrook within 24 hours, braced two compromised piles, and prevented a total failure. Our emergency shoring keeps you safe while we restore the foundation properly.

Professional Results & Quality

We use proven systems that stop decay and restore capacity. Options include SnapJacket vinyl jackets with grout infill, FRP wet layup wraps like PileMedic, and new CCA‑treated timber (0.80–2.5 pcf) or steel pipe piles with cathodic protection. Where specs require, we perform dynamic load checks and follow manufacturer installation standards.

The outcome: straight, aligned pilings that transfer loads correctly to the soil. Hardware is stainless or hot‑dip galvanized to fight corrosion, and connections are reset to industry best practice for long service life.

Time & Stress Savings

Our barge with crane, vibratory hammer, pile extractor, and jetting pump lets us work fast—even in tight canals. Many jacketing repairs finish without removing deck boards or shutting down your slip. We also handle permit coordination, so you’re not stuck in paperwork.

In Clear Lake, a four‑pile repair with jacketing typically takes 1–2 days once materials are on site. You get predictable scheduling, one point of contact, and a crew that shows up prepared.

Cost‑Effective Solution

Repair can be significantly less than full replacement. Jacketing often salvages piles with sound cores, avoiding extraction costs and saving surrounding decking. When replacement is smarter, we set the right material the first time to prevent repeat failures and hidden expenses.

We also prevent collateral damage—no unnecessary demo, careful barge positioning, and tidy cleanup. The savings come from fewer surprises and solutions matched to actual conditions.

Peace of Mind & Warranty

We’re fully insured, adhere to OSHA/EM 385‑1‑1 safety practices, and back our work with clear written warranties. You’ll receive before/after photos, material records, and maintenance tips tailored to local waters like Galveston Bay and Lake Houston.

If you ever need support, we answer the phone and make it right. That’s how we’ve earned repeat business from marinas, HOAs, and waterfront homeowners across Greater Houston.

Get a Fast, Free Piling Inspection

Speak with a local specialist today. We’ll assess your pilings, outline repair vs. replacement options, and provide a written estimate—no pressure, no guesswork.

How Our Piling Repair & Replacement Process Works

We make it simple, safe, and transparent—from inspection to final walkthrough. Here’s what to expect:

1) On‑Site Assessment

We inspect each piling above and below water, check connections, and document damage, rot, and corrosion.

2) Plan & Written Estimate

Receive a clear scope with repair vs. replacement recommendations, materials, timeline, and permit guidance.

3) Stabilization & Prep

We shore critical areas, stage materials via barge, and coordinate access with neighbors or marina staff.

4) Repair or Replacement

We install jackets/wraps with grout infill, splice or sister pilings, or extract and redrive new piles as specified.

5) Final Walkthrough & Warranty

We review results with you, share photos, provide maintenance tips, and issue your warranty.

It’s Easy to Get Started

Request your assessment in minutes. We’ll handle the heavy lifting—planning, permits, and repairs—so you can get back on the water sooner.

Why Choose Houston Docks for Piling Repair & Replacement in Houston

Houston Docks brings 15+ years of marine construction experience, thousands of completed projects, and a safety‑first culture to every job. For Piling Repair & Replacement Houston TX, we combine certified crews, purpose‑built equipment, and proven repair systems to deliver durable results. Expect honest advice, clean work, and clear communication from a local, family‑owned team.

Certified Marine Construction Team

Our crews hold OSHA 10/30 Construction, NCCCO crane operator, and AWS D1.1 structural welding credentials. When diving is required, we use commercially trained personnel and follow strict protocols. This certification stack means your project is executed correctly and safely.

We’re active with Pile Driving Contractors Association and DFI, staying current on repair standards, FRP jacketing, and load‑transfer best practices. Complex conditions don’t intimidate us—we plan, engineer, and build to spec.

Licensed, Insured, and Safety‑Driven

We carry full marine general liability and workers’ compensation, provide COIs on request, and implement site‑specific safety plans. Practices align with OSHA 29 CFR 1926 Subpart M for fall protection and USACE EM 385‑1‑1 where applicable.

Working over water requires discipline: life jackets, ring buoys, skiff readiness, and controlled access. Our safety culture protects your property and everyone on site.

Right Equipment, Right Materials

We operate a barge with crane, vibratory and diesel/hydraulic hammers, pile extractors, jetting pumps, torque motors for helical systems, and concrete/grout pumps. This toolkit lets us work efficiently across canals, rivers, and bays.

Material options are matched to the environment: CCA‑treated timber (0.80–2.5 pcf), SnapJacket vinyl jackets, FRP wraps (e.g., PileMedic), steel H‑piles/pipe piles with sacrificial anodes, and grout/epoxy infills. We specify marine‑grade hardware for corrosion resistance throughout Greater Houston.

Local Permitting & Waterfront Expertise

We assist with the City of Houston Lake Houston permits (HPWCODE1006 license and HPWCODE1003 pier permits), plus USACE Section 10/404 and Texas GLO Joint Permit applications when required. Our familiarity with Clear Lake, Kemah, Seabrook, League City, Baytown, and Galveston speeds approvals.

We coordinate submittals, drawings, and timelines, so you avoid delays and stay compliant with shoreline rules and floodplain requirements where applicable.

Customer‑First Warranties & Communication

You’ll receive a dedicated project lead, proactive updates, and photo documentation from start to finish. We also provide insurance claim support when storm damage is involved, including itemized scopes and evidence packages.

Warranties are clear and in writing. Our goal is simple: make your structure stronger and your experience hassle‑free.

Experience You Can Trust

Join homeowners, HOAs, and marinas across Houston who rely on us. Request your free piling assessment and written quote today.

Proven Piling Repair & Replacement Backed by Local Expertise

We’ve repaired and replaced pilings for residential docks, boathouses, HOA piers, and marinas across the Greater Houston area—from Lake Houston and Clear Lake to Galveston Bay and Trinity Bay. Our team applies field‑tested methods and the right materials for each environment. Considering Piling Repair & Replacement Houston TX? Here’s how our work translates to your project.

Types of Piling Projects We Handle

Residential: fishing piers, boat‑lift piles, and backyard docks with timber or composite decking. We correct out‑of‑level lifts and unsafe walkways without full rebuilds when feasible.

Commercial: marina slips, boardwalks, and community piers using timber, steel, or concrete piles. We schedule around operations to minimize slip closures and tenant disruption.

Our Proven Methods & Standards

For wood piles with localized loss, we install vinyl jacketing with grout infill or FRP wraps to encapsulate and restore section capacity. Where decay is too advanced, we extract and redrive with treated timber or steel and reset connections.

We also perform pile splicing/sister pilings, install cathodic anodes on steel, and use stainless/HDG hardware. PDA load checks are available when engineering requires verification.

Complex Conditions We’ve Mastered

Post‑storm recoveries (including Beryl): temporary shoring within 24–48 hours, followed by phased repairs. Tight canal access in Seabrook/Kemah: shallow‑draft barge and jetting to limit disturbance.

Splash‑zone deterioration: cofferdam or timed low‑tide repairs to ensure proper cure and encapsulation. We tailor the approach to soil, wake exposure, and salinity.

Results You Can Expect

Typical timelines: 2–5 days for 2–6 piling repairs; 1–2 weeks for partial replacements; larger marina scopes scheduled in phases. We provide firm dates after inspection and material confirmation.

Expected service life: properly treated timber or steel with protection can deliver decades of use; encapsulated piles stop active deterioration and extend life substantially. You’ll receive maintenance guidance to keep performance high.

Want Examples From Nearby Projects?

Ask us for recent piling repairs in your area—we’ll share case details, materials used, and homeowner references upon request.

Frequently Asked Questions

How much does piling repair or replacement cost in Houston?
Costs vary by access, water depth, material, and scope. As a ballpark, jacketing a timber pile with vinyl or FRP typically ranges from $900–$2,200 per piling, including grout. Full replacement can run $2,500–$6,500+ per pile for treated wood, and more for steel or concrete. Marinas and deepwater sites trend higher. After an on‑site inspection, we’ll provide a written, line‑item estimate tailored to your dock or pier in the Houston area.
Repair vs. replacement: When should I replace dock or pier pilings?
If decay, breakage, or section loss is localized and the core is sound, encapsulation (vinyl/FRP jacketing) often restores strength. Replace when piles are fractured, severely reduced in diameter, misaligned, or undermined. We also consider boat‑lift loads, soil conditions, and wake exposure. Our assessment includes photos, hammer soundings, and probe checks so you can choose the safest option for your Houston shoreline.
What permits are required for a pier on Lake Houston or Galveston Bay?
On Lake Houston, most projects require the City’s Stationary/Floating Piers Permit (HPWCODE1003) and the Annual Pier License (HPWCODE1006). Along coastal waters like Galveston Bay, USACE Section 10/404 and Texas General Land Office Joint Permit may apply. Harris County floodplain approvals can also be required in mapped flood zones. We help prepare submittals, drawings, and timelines so your project stays compliant and on schedule.
What materials are best for pilings in brackish or saltwater?
Treated timber (0.80–2.5 pcf CCA) remains common for residential piers. In higher salinity or heavy‑use locations, steel pipe piles with cathodic protection or reinforced concrete piles offer excellent durability. Composite FRP piles are another option in corrosive environments. We match materials to exposure (Galveston Bay vs. Lake Houston), budget, and structural loads, then specify hardware to resist corrosion long‑term.
How does FRP or vinyl jacketing work for damaged wood pilings?
Jacketing encapsulates the pile to stop rot and restore capacity. We install a vinyl or FRP jacket around the piling and pump grout or epoxy into the annulus, bonding to sound wood and creating a new protective shell. Systems like SnapJacket or FRP wraps are effective in the splash zone and below waterline. It’s a fast, non‑invasive method when the core remains structurally sound.
Can pilings be repaired without removing the entire dock?
Often yes. Many encapsulation methods install from a barge without lifting deck boards. We work pile‑by‑pile, shore loads as needed, and maintain access to adjacent slips. If a pile must be extracted, we limit demo and reset connections cleanly. You’ll know upfront if limited removal is required for safe access on your Houston property.
What is the typical timeline for piling repair projects?
Small scopes (2–6 piles) generally take 2–5 working days once materials are staged. Partial replacements may run 1–2 weeks. After major storms like Beryl, city and material lead times can add 1–3 weeks. We provide a target start date, daily updates, and a firm completion plan after site inspection and permitting confirmation.
Do you help with insurance claims after storms?
Yes. We document damage with photos, measurements, and a detailed scope and estimate that align with policy requirements. We also note hurricane/wave impacts, undermining, and safety hazards to support your claim. Our team coordinates with adjusters and provides supplements if hidden damage is uncovered during repairs.
What warranties do you offer on piling repairs and replacements?
Warranties vary by method and material, typically 1–3 years on repairs and up to 5 years on replacements when installed per spec. Manufacturer warranties apply on systems like SnapJacket or FRP wraps. We provide written terms, care recommendations, and a maintenance schedule to keep your dock or pier performing in the Houston climate.
What is the process for the Lake Houston Annual Pier License and how long does approval take?
Step 1: Verify ownership and submit the City application (HPWCODE1006) with a plan sketch. Step 2: Address any code notes and fees. Step 3: Schedule inspection if required. Typical approvals take 2–6 weeks, longer if combined with a Stationary/Floating Piers Permit (HPWCODE1003). We’ll prepare drawings, coordinate with the City, and keep your project moving.

Still Weighing Options?

Send us your questions and a few photos. We’ll recommend the safest, most cost‑effective path and provide a clear estimate—no obligation.